EP600 Energy Storage System User Manual
6.Electrical connection of EP600 energy
storage system
Before installation and maintenance , make sure neither the AC side nor the DC side is electrified.
For a period of time after the inverter is electrified and disconnected , the capacitor
is still electrified , so it
is necessary to wait treat 30 minutes to ensure that the capacitor is fully discharged. If it is not used
as required, it may cause safety hazards.
Danger
Always turn off the DC switch before making electrical connections on the
DC side.
Warning
All installation operations must be performed only by professional
authorized personnel.
The specification of cables used in the Energy Storage System must be
proper, with strong connections and good insulation.
Incorrect wiring may cause damage to the product, which will not within the
warranty .
Attention
The installation and maintenance of the inverter must be operated by
professional authorized personnel.
Wear protective clothing (protective glasses and boots)
when working in
high-voltage or high-current systems (such as inverters and battery systems ).
Instruction
The open circuit voltage of the PV modules connected to the EP600 cannot be
more than 550V . The connected PV modules must have an IEC61730 class
rating.
Table 6-1 Current parameters
Model
IscPV (absolute
maximum)
Maximum input
overcurrent protection
EP600
15A/15A
15A/15A