MAP 5000 Connections | en 49
Bosch Security Systems B.V. Installation manual 2019-09 | 25 | F.01U.168.332
LSN gateway stub configuration
3.6 Optional connections
Optional power supply connections
1. Connect the auxiliary DC power for the 12 V converter.
2. Connect the supervision outputs. The supervision outputs monitor AC mains failure and
summary power supply trouble.