Procedural Instructions on the TSC
8
Perfusor® compact, 3.0 gb 8- 3
11. Pull syringe holder.
Staff call: red LED in MFC service connector lights up. Drive
stops.
Note
The following staff call modes can be selected in the Service
Program if the unit is switched off: static, dynamic with and
without alarm.
12. Switch device off.
13. Disconnect unit from mains power.
14. Switch unit on in battery mode.
Pressure Cut-Off
1. Set pressure stage 1 (key sequence F 3 1 F START).
CAUTION
The limit values of the Checklist for Checks after Repair do not
correspond to the TSC values.
2. Pump continues to deliver at 96.0 ml/h and switches off when
the specified pressure is reached.
3. Enter value in check list.
4. Set pressure stage 2 (key sequence F 3 2 F START).
5. Pump continues to deliver at 96.0 ml/h and switches off when
the specified pressure is reached.
6. Enter value in check list.
7. Set pressure stage 3 (key sequence F 3 3 F START).
8. Pump continues to deliver at 96.0 ml/h and switches off when
the specified pressure is reached.
9. Enter value in check list.
WARNING
!
The current step gauge can release suddenly when unlocked
manually.
DANGER OF INJURY!
- Do no open toggle.
10. Release current step gauge (key sequence F 3 0). You must
use the service connector for this.
Fig.: 8 - 2
OPS 50 ml slot
3.0