EasyManua.ls Logo

Braun perfusor compact - Pressure Cut-Off

Braun perfusor compact
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedural Instructions on the TSC
8
Perfusor® compact, 3.0 gb 8- 3
11. Pull syringe holder.
Staff call: red LED in MFC service connector lights up. Drive
stops.
Note
The following staff call modes can be selected in the Service
Program if the unit is switched off: static, dynamic with and
without alarm.
12. Switch device off.
13. Disconnect unit from mains power.
14. Switch unit on in battery mode.
Pressure Cut-Off
1. Set pressure stage 1 (key sequence F 3 1 F START).
CAUTION
The limit values of the Checklist for Checks after Repair do not
correspond to the TSC values.
2. Pump continues to deliver at 96.0 ml/h and switches off when
the specified pressure is reached.
3. Enter value in check list.
4. Set pressure stage 2 (key sequence F 3 2 F START).
5. Pump continues to deliver at 96.0 ml/h and switches off when
the specified pressure is reached.
6. Enter value in check list.
7. Set pressure stage 3 (key sequence F 3 3 F START).
8. Pump continues to deliver at 96.0 ml/h and switches off when
the specified pressure is reached.
9. Enter value in check list.
WARNING
!
The current step gauge can release suddenly when unlocked
manually.
DANGER OF INJURY!
- Do no open toggle.
10. Release current step gauge (key sequence F 3 0). You must
use the service connector for this.
Fig.: 8 - 2
OPS 50 ml slot
3.0

Related product manuals