©2013 Brooks Automation Inc. Pub. No. 8040444, Rev. AA 01/14/2013 ECO No. 63723 2-1
9600 Compressor Installation, Operation and Maintenance Instructions
Section 2 - Unpacking and Inspection
Introduction
The 9600 Compressor is shipped in a shipping carton incorporating a ramp
system which makes removing the Compressor from the carton safe and
easy.
Shipping Carton Inspection
Inspect the exterior of the shipping carton for visible signs of damage
before opening the shipping carton. Report any damage to the shipping
company at once.
Removal from Shipping Carton
1. Cut the two straps on the exterior of the shipping pallet.
2. Lift the cardboard carton straight up and remove it from the
pallet.
3. Cut the tape which holds the ramp in the vertical position.
4. Swing the ramp down until the end touches the floor.
5. Remove any excess shipping material from around the Compressor.
WARNING
Maintain control over the movement of the Compressor as it rolls
down the ramp. Injury to personnel may result if the Compressor is
allowed to roll freely down the ramp.
CAUTION
Maintain control over the movement of the Compressor as it rolls
down the ramp. Damage to the Compressor may result if the
Compressor is allowed to roll freely down the ramp.