EasyManua.ls Logo

Brother BAS-340 - Voltage Measurement

Brother BAS-340
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
111
Volt~ge
measurement
1.
Checking
the
control voltage
Turn on power while connecting the connector
P1
to
the control
PCB,
then measure
the
voltages
between pins 1 and
2,
3 and
4,
and
between 5 and 6
of
connector
P1.
Check points
of
P1
Acceptable value
on
the
control
PCB
Between pins 1 and 2
Approx.
65
Vdc
Between pins 3 and 4
Approx. 8.5Vdc
Between pins 5 and 6
Approx.
0.25 Vdc
2.
Checking
the
+
SV
source
Turn on power while connecting the connector
P12
to
the control
PCB~
then
measure
the
voltage
between pins 1 and 2
of
connector
P12.
3.
Checking solenoids' voltages
p 1
-57-
Check points
of
P12
on
the
control
PCB
Acceptable value
Between pins 1 and 2
5
±0.25
Vdc
1)
Turn the power switch
OFF.
i'·
Disconnect connector
P1
from
J1,
then measure
each
solenoid resistance.
Check points
Solenoid
Acceptable
value
Between pins 1 and 2 Thread
trimming
solenoid
Approx.100
Between pins 3 and 4 Thread
wiper
solenoid
Approx.60
2)
Insert
P1
into
J
1,
then
turn
the power switch
ON.
Insert the test probe from
the
lead
wire
side and measure the voltage.
Check points Solenoid
Acceptable
value
Between pins 1 (
+)
and 2(-)
Thread
trimming
solenoid 60V
Between pins 3(
+)
Thread
wiper
solenoid 60V
and 4(-)
The
indicator
should
oscillate
instantly
after
sewing.
From the library of: Superior Sewing Machine & Supply LLC

Table of Contents

Other manuals for Brother BAS-340

Related product manuals