EasyManua.ls Logo

Buhler DFTA 12 - 6 Operation

Buhler DFTA 12
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Throw sifter Operation 27
© Copyright 2018 Bühler AG DFTA-66620-2-en-1803
6 Operation
After all checks have been carried out, the machine can be put in operation with
product.
Procedure:
1. Switch on the aspiration system.
2. Start the vibrator motors.
3. Switch on product feed.
When switching the machine off, the feed must be switched off first and the vibrator
motors and the aspiration system can only be switched off after no more product
remains on the sieve.

Related product manuals