3.6 Water line connection
This equipment must be installed in compliance with applicable Federal,
State, Provincial and/or Municipal plumbing codes having jurisdiction.
Make sure that the equipment is unplugged before proceeding with the water supply
installation. Also verify that the incoming water pressure is greater than 20 psi and no more
than 80 psi.
1. Priortoinstallingtheequipment,ushoutthewaterlinebyrunningapproximately1gal.ofwaterintoa
pail. This will ensure no sediment from a new installation can get in the equipment;
2. The incoming water supply should have a shut-off valve connected in-line. Water supply should be a
plastic 1/4” or 3/8” O.D. dedicated line branched off a larger supply line;
3. Makesureyourwatersourceisturnedoff.Securetheinletttingrmlyontotheinletvalve.Donot
overtighten;
4. Makesuretheequipmentisunplugged.Connectthewaterlinetothequickconnectinlettting;
5. Turn the water valve on, sending water to the brewer. If there are any leaks, tighten connections to stop
leakage.
This procedure does not take into consideration the installation of a water
ltrationsystem.Pleaserefertothewaterltermanufacturerinstallation
instructions and incorporate them into the above procedures.