EasyManua.ls Logo

Cafection Avalon Galleria - 3.14 Testing installation

Cafection Avalon Galleria
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
23
www.cafection.com (800) 561-6162
Initial Setup
3.14 Testing installation
It is important to have the equipment performing several cycles before completing the installation. It is
important that you order at least 2 of each product selections to insure that the brewer is operating as per
thespecicationslaidoutinthismanual.Duringthisprocess,reviewthechecklistasareminder.
You need to be sure that the brewer is clean, safe and functioning once you’re ready to leave it on-site.
What to check
Inlet valve is free from leaks Verify that it is secure and not overtightened
Brew chamber is empty of coffee
Verify that the unit is leveled
Filter paper feeds without resistance and
goes straight into the waste bin
Verify that the chute is properly installed
Repeat the installation procedure
Soluble mixing bowl is free of leaks Verify that it is on straight and tube is secure
Water temperature is acceptable See water temperature
Products are loaded Load products
Brewer and area are clean and tidy Please tidy up

Table of Contents

Related product manuals