EasyManua.ls Logo

Cafection Avalon Galleria - 6 PREVENTIVE MAINTENANCE; 6.1 Preventive maintenance schedule (PM)

Cafection Avalon Galleria
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
43
www.cafection.com (800) 561-6162
Preventive Maintenance
6 PREVENTIVE MAINTENANCE
All major parts of this unit need to be maintained as per the schedule to honor the warranty
and to prevent them from failing. With adequate maintenance you will extend the life of your
unit and deliver a consistent high quality beverage.
The preventive maintenance schedule and instructions below must be
followed to honor the warranty.
6.1 Preventive maintenance schedule (PM)
All parts should be visually inspected upon each visit and cleaned as needed.
Parts Monthly Quarterly 10,000 25,000 60,000 100,000
Brewer Inspect Replace
Outlet valves Inspect PM
Water tank Inspect PM

Table of Contents

Related product manuals