EasyManua.ls Logo

CENTURION SYSTEMS R6 - Site Preparation and Cabling; General Installation Considerations

CENTURION SYSTEMS R6
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 13 www.centsys.com
NEW SITE INSTALLATION PREPARATIONSECTION 5
5. New Site Installation Preparation
5.1. General Considerations for the Installation
Itisalwaysrecommendedtotadditionalsafetyequipmentsuchassafetyedgesand
safety beams, for additional protection against entrapment or other mechanical risks.
Check that no pipes or electrical cables are in the way of the intended installation.
Check that enough space is available for the gate operator.
Check for loose, sandy soil if installing the operator on a pedestal, as the soil
conditionmayrequirealargerfoundation.
Neverttheoperatorontheoutsideofthegate,wherethepublichasaccesstoit.
Install the gate operator only if:
It will not pose a hazard to the public
Thereissucientclearancetoaroadwayand/orpublicthoroughfares
Theinstallationmeetsallmunicipaland/orlocalauthorityrequirementsoncecompleted
Thegatemassandapplicationarewithintheoperatorspecications
Thegateisingoodworkingorder,meaning:
that it opens and closes freely;
does not move on its own if left in any position;
itcanbeinstalledtohavesucientclearancebetweenmovingpartswhen
opening and closing to reduce the risk of personal injury and entrapment;
Pushbuttonsorkey-switches,whenrequired,canbepositionedsothatthegateisin
line-of-sight of the user

Related product manuals