EasyManua.ls Logo

Cimbali M26 - Daily Operation

Cimbali M26
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
3
2
ON
English
10 EN
10. Daily operation
USE
“Before setting the machine to work, make sure that:
the main electric power switch is on;
the mains water tap has been turned on".
DT version with display
MANUAL POWERING
MANUAL POWERING
Press the luminous main switch.
The the keys light up and the following message will appear
on the display:
While waiting for the machine to be ready for use, insert
WKH¿OWHUKROGHUVLQWKHXQLWV.
The machine is ready to work when the display indicates
the working pressure:
If the water level in the boiler is lower than the minimum
OLPLWWKHERLOHUZLOOEH¿OOHGWRWKHULJKWOHYHO. At the end of
this phase, the icon will appear in the lower left hand
corner of the display.
The preset working pressure must be reached before the
machine is ready for use.
If one of the keys is pressed during this phaseFRႇHH
will be served at the temperature reached at that moment.
If any dispensing key is pressed, the following message will
appear on the display:
20 September 2017
wednesday 15:18:12
20 September 2017
wednesday 15:15:04
20 September 2017
wednesday 15:15:04
MACHINE COLD
PLEASE WAIT
02_M26_UNICO_EU_2314.indd 10
02_M26_UNICO_EU_2314.indd 10
07/04/2023 12:04:58
07/04/2023 12:04:58

Table of Contents

Related product manuals