EasyManuals Logo

Cisco ASR1006 - ASR 1006 Modular Expansion Base User Manual

Cisco ASR1006 - ASR 1006 Modular Expansion Base
462 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #119 background imageLoading...
Page #119 background image
Software Upgrade Process
ISSU Upgrade for Redundant Platforms
37
Cisco ASR 1000 Series Aggregation Services Routers Software Configuration Guide
Checking candidate package set infrastructure compatibility
Checking infrastructure compatibility with running software
Checking package specific compatibility
Finished compatibility testing
--- Starting impact testing ---
Checking operational impact of change
Finished impact testing
--- Starting commit of software changes ---
Updating provisioning rollback files
Creating pending provisioning file
Committing provisioning file
Finished commit of software changes
--- Starting analysis of software changes ---
Finished analysis of software changes
--- Starting update running software ---
Blocking peer synchronization of operating information
Creating the command set placeholder directory
Finding latest command set
Finding latest command shortlist lookup file
Finding latest command shortlist file
Assembling CLI output libraries
Assembling CLI input libraries
Applying interim IPC and database definitions
Replacing running software
Replacing CLI software
Restarting software
Restarting ESP0
Applying final IPC and database definitions
004324: Oct 5 12:31:20.470 EDT: %CMRP-5-PRERELEASE_HARDWARE: R0/0: cmand: F0:0 is
pre-relea
se hardware
004327: Oct 5 12:32:02.485 EDT: %CMRP-5-PRERELEASE_HARDWARE: R0/0: cmand: F0:0 is
pre-relea
se hardware Generating software version information
Notifying running software of updates
Unblocking peer synchronization of operating information
Unmounting old packages
Cleaning temporary installation files
Finished update running software
SUCCESS: Finished installing software.
Router# i
ssu commitversion
--- Starting installation changes ---
Cancelling rollback timer
Finished installation changes
SUCCESS: Installation changes committed
Router# i
ssu loadversion rp 0 file bootflash:asr1000rp1-rp*02.02.01.122-33.XNB1*.pkg force
--- Starting installation state synchronization ---
Finished installation state synchronization
--- Starting file path checking ---
Finished file path checking
--- Starting image file verification ---
Checking image file names
Verifying image file locations
Locating image files and validating name syntax
Inspecting image file types

Table of Contents

Other manuals for Cisco ASR1006 - ASR 1006 Modular Expansion Base

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco ASR1006 - ASR 1006 Modular Expansion Base and is the answer not in the manual?

Cisco ASR1006 - ASR 1006 Modular Expansion Base Specifications

General IconGeneral
Rack Units6U
Form FactorRack-mountable
Operating Temperature32 to 104°F (0 to 40°C)
Product TypeRouter
Slots6
RedundancyRedundant Power Supply Supported
Maximum Throughput100 Gbps
Dimensions17.5" Width
WeightApproximately 130 lbs (59 kg)
Interfaces/PortsVaries by installed modules
Memory4 GB
Storage Temperature-40°F to 158°F (-40°C to 70°C)
Relative Humidity5% to 95% (noncondensing)
ComplianceCE, UL

Related product manuals