EasyManua.ls Logo

Cisco Nexus 7004 - Page 206

Cisco Nexus 7004
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 136: Clearances Required for a Front-Mounted Cisco Nexus 7009 Chassis in a Two-Post Rack
Side clearance required for open rack
installations:
If next to another open rack, use 6 inches
(15.2 cm).
If next to a wall, use 11 inches (27.9 cm).
9Cisco Nexus 7009 chassis1
Chassis width10Cable management frames2
Side clearance required for open rack
installations:
If next to another open rack, use 6 inches
(15.2 cm).
If next to a wall, use 11 inches (27.9 cm).
11Vertical rack-mount post3
Rear service clearance required to replace fan
trays and fabric modules
12Vertical rack-mount post for neighboring rack4
Airflow clearance required between the chassis
and inside of cabinet (if used)
13Air intake from cold aisle for the power supplies5
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
194
Technical Specifications
Cisco Nexus 7009 Chassis Clearances

Table of Contents

Related product manuals