Verification Time and DatePlanning Activity
Power evaluation:
• Input power type
• Power receptacles
• Receptacle proximity to the equipment
• Dedicated (separate) circuits for power
redundancy
• UPS for power failures
• Grounding: proper gauge wire and lugs
• Circuit breaker size
Grounding evaluation:
• Data center ground
Cable and interface equipment evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment (transceivers)
EMI evaluation:
• Distance limitations for signaling
• Site wiring
• RFI levels
Contact and Site Information
Use the following worksheet (Table 71: Contact and Site Information , on page 252) to record contact and site
information.
Table 71: Contact and Site Information
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
252
Site Preparation and Maintenance Records
Contact and Site Information