EasyManua.ls Logo

Cisco Nexus 7004 - Page 208

Cisco Nexus 7004
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 137: Clearances Required for a Center-Mounted Cisco Nexus 7009 Chassis in a Two-Post Rack
Right side clearance (for rack installations)
recommended to input air from the cold aisle:
If next to another open rack, use 6 inches
(15.2 cm).
If next to a wall, use 11 inches (27.9 cm).
9Cisco Nexus 7009 chassis1
Chassis width10Cable management frames2
Right side clearance (for rack installations)
recommended to input air from the cold aisle:
If next to another open rack, use 6 inches
(15.2 cm).
If next to a wall, use 11 inches (27.9 cm).
11Vertical rack-mount posts3
Rear service clearance required to replace fan
trays and fabric modules
12Vertical rack-mount post for neighboring rack4
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
196
Technical Specifications
Cisco Nexus 7009 Chassis Clearances

Table of Contents

Related product manuals