EasyManua.ls Logo

Cisco UCS X210c M6 - Page 48

Cisco UCS X210c M6
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 5 Transfer the CPU and carrier to the fixture.
a) When all the CPU clips are disengaged, grasp the carrier and lift it and the CPU to detach them from the heatsink.
If the carrier and CPU do not lift off of the heatsink, attempt to disengage the CPU clips again.
Note
b) Flip the CPU and carrier right-side up so that the words PRESS are visible.
c) Align the posts on the fixture and the pin 1 locations on the CPU carrier and the fixture (1 in the following illustration).
d) Lower the CPU and CPU carrier onto the fixture.
Cisco UCS X210c M6 Compute Node Installation and Service Note
40
Servicing a Compute Node
Removing the CPU and Heatsink

Table of Contents

Related product manuals