ii
750-96 (revised 2010)
CB Packaged Boiler Manual
CHAPTER 2 The Pressure Vessel 2-1
2.1 — Overview 2-1
2.2 — Construction 2-1
2.3 — Water Requirements 2-2
2.3.1 — Hot Water Boiler 2-2
2.3.1.1 — Air Removal 2-2
2.3.1.2 — Minimum Boiler Water Temperature 2-2
2.3.1.3 — Rapid Replacement of Boiler Water 2-2
2.3.1.4 — Continuous Flow Through the Boiler 2-3
2.3.1.5 — Water Circulation 2-3
2.3.1.6 — Multiple Boiler Installations 2-3
2.3.1.7 — Pressure Drop Through Boiler 2-4
2.3.1.8 — Pump Location 2-4
2.3.1.9 — Pump Operation 2-4
2.3.1.10 — Pressure 2-4
2.3.2 — Steam Boiler 2-5
2.3.2.1 — Feed Pump Operation 2-5
2.3.2.2 — Water Feeder Operation 2-5
2.4 — Water Treatment 2-6
2.5 — Cleaning 2-7
2.5.1 — Hot Water and Steam Piping 2-7
2.5.2 — Pressure Vessel 2-7
2.6 — Boil-Out of a New Unit 2-8
2.7 — Washing Out 2-10
2.7.1 — Hot Water Boiler 2-10
2.7.2 — Steam Boiler 2-10
2.8 — Blowdown: Steam Boiler 2-10
2.8.1 — Manual Blowdown 2-11
2.8.2 — Continuous Blowdown 2-11
2.8.3 — Frequency of Manual Blowdown 2-11
2.8.4 — Manual Blowdown Procedure 2-12
2.9 — Periodic Inspection 2-13
2.10 — Preparation for Extended Layup 2-14
CHAPTER 3
Sequence of Operation 3-1
3.1 — Overview 3-1