750-96 (revised 2010)
CB Packaged Boiler Manual
iii
3.2 — Circuit and Interlock Controls 3-2
3.3 — Sequence of Operation: Oil or Gas 3-3
3.3.1 — Pre-Purge Cycle 3-3
3.3.2 — Ignition Cycle 3-4
3.3.3 — Run Cycle 3-4
3.3.4 — Burner Shutdown Post Purge 3-5
3.4 — Flame Loss Sequence 3-5
3.4.1 — No Pilot Flame 3-6
3.4.2 — Pilot But No Main Flame 3-6
3.4.3 — Loss of Flame 3-6
CHAPTER 4 Starting and Operating Instructions 4-1
4.1 — General Preparation for Startup: All Fuels 4-1
4.2 — Control Settings: Steam and Hot Water 4-2
4.3 — Gas Pilot 4-3
4.4 — Atomizing Air 4-3
4.5 — Firing Preparations for No. 2 Oil: Series 100-200 4-4
4.5.1 — Oil Flow 4-4
4.5.2 — Oil Pressure 4-5
4.5.3 — Starting 4-5
4.6 — Firing Preparations for No. 4 Oil: Series 800-900 4-6
4.6.1 — Oil Flow 4-6
4.6.2 — Oil Pressure 4-6
4.6.3 — Oil Temperature 4-6
4.6.4 — Starting 4-7
4.7 — Firing Preparations for No. 5 Oil: Series 300-500 4-7
4.7.1 — Oil Flow 4-7
4.7.2 — Oil Pressure 4-7
4.7.3 — Oil Temperature 4-8
4.7.4 — Starting 4-8
4.8 — Firing Preparation for No. 6 Oil: Series 400-600 4-8
4.8.1 — Oil Flow 4-8
4.8.2 — Oil Pressure 4-9
4.8.3 — Oil Temperature 4-9
4.8.4 — Starting 4-10
4.9 — Firing Preparations for Gas: Series 200-300-400-700-900 4-10