CODEL
OPS. 141 3
Issue : A
Revision : 1
Date : 14/06/18
Doc i/d : 0141/6
050028
Contents
1. System Description 1
1.1. Opacity Measurement 1
1.2. About this Manual 1
2. Installation 2
2.1. Unpacking the Equipment 2
2.2. Siting the Equipment 2
2.3. Duct Work 4
2.4. Air Purge 5
2.5. Transmitter & Receiver Units 6
2.6. Air Supply 6
2.7. Signal Processor and Power Supply Units 7
2.8. AC Supplies 7
2.9. Outputs 8
2.10. Normalising Inputs 8
2.11. Cable Requirements 8
2.12. Plant Status Input 9
2.13. Connection Schedule 9
3. Commissioning 11
3.1. Introduction 11
3.2. Turning the Power On 11
3.3. Key Pad Operation 12
3.3.1. Mode Key 12
3.3.2. Arrow Keys 12
3.3.3. Enter Key 12
3.3.4. LED Indication 13
3.4. Alignment 13
3.5. Gain Adjustment 15