Technical Manual CODEL
OPS.080 Issue : C Rev. : Date : 16/7/08 Doc. i/d : 0080/6 Ref. : 080040
5.3.6. Cell Oven Control 32
5.3.7. Detector levels 36
5.3.8. Zero Calibration 36
5.3.9. Current Data 38
5.3.10. 'Y' Values 39
5.3.11. Plant Status Set-Up 40
5.3.12. Span Verification 41
5.3.13. Water Vapour Checks 44
5.3.14. General Overview 44
5.3.15. Setting the Output Configuration 45
5.3.16. Read/Set RTC 47
5.3.17. Memory Back-Up 49
6. Analyser Records 51
6.1. Serial Numbers (Complete on First Inspection) 51
6.2. Installation Records 51
6.3. Commissioning Records 51
6.3.1. Table 1 : Analyser Configuration Record - Parameters 51
7. Calibration and Measurement Verification 52
7.1. Introduction 52
7.2. Factory Calibration 52
7.3. Verification 52
7.3.1. Automatic Zero Calibration 52
7.3.2. Manual Zero Verification 52
7.3.3. Comparative Testing 53
7.4. Re-calibration 53
8. Maintenance 54
9. Fault Finding 55
Appendix 1 – Setting Analyser Gains 58
List of Figures 59