InteliMains
NT
, SW version 3.0  
InteliMains-NT-BTB-3.0-Reference Guide.pdf, ©ComAp – June 2013   
parallel operation with the mains.  
NOTE:  
# sign in the name of this setpoint marks that this setpoint is shared among 
all controllers connected by CAN2 bus.  
 
 
12.2.8.5  Setpoint: #SysAMFstopDel 
System stop delay between input Sys start/stop opening and Power 
Management System deactivation. When input Sys start/stop is controlled by 
mains decoupling relay, this is a delay among the end of mains failure and 
opening of GCB. If the MCB feedback is closed, gen-sets are unloaded to 
mains prior to GCB opening. 
NOTE:  
# sign in the name of this setpoint marks that this setpoint is shared among 
all controllers connected by CAN2 bus.  
 
 
12.2.8.6  Setpoint: #LoadResStrt 1 
-32000 .. LoadResStop 1 [kX]  
This setpoint is used to adjust the load reserve for start in absolute mode. i.e. 
Pwr mgmt mode = ABS (kW) or ABS (kVA) if the reserve set #1 is active. 
Learn more about reserves in the chapter Reserves, minimal running power. 
The currently active reserve set is selected by binary inputs Load res 2, Load 
res 3 and Load res 4. If none of these inputs is active the set #1 is selected. 
NOTE:  
If the absolute power management is selected, this setpoint (or the setpoints 
LoadResStrt 2, LoadResStrt 3 or LoadResStrt 4 depending on which load 
reserve set is selected) determines also the number of gensets (that are part 
of the power management) which will start (according to their priority and 
nominal power).  
 
NOTE:  
There is a possiblity to assign this setpoint negative number. This can be 
used in some situations to allow genset start after Sys Start/Stop gets active.