4 Operation
Operator manual: Postmix tower
Ribbon
37
Cornelius Deutschland GmbH
Document no. TD0000000
Version: 19/10/2017, Index 3
4.5 Commissioning
1. Clean the unit, assemblies and components; see chapter 5.2, page 42.
2. Check if the plug (cable no. 220046667) (Figure 49/2) is
connected to the E-Box (Figure 49/1).
If necessary, connect the plug (cable no. 220046667)
(Figure 49/2) to the E-Box (Figure 49/1).
3. Check if the plug (cable no. 141647504 EU) (Figure 50/
2) is connected to the E-Box (Figure 50/1).
If necessary, connect the plug (cable no. 141647504 EU)
(Figure 50/2) to the E-Box (Figure 50/1).
4. Check if the plug (cable no. 141647504 EU) (Figure 51/
2) of the E-Box (Figure 51/1) is connected to the mains
supply.
If necessary, connect the plug (cable no. 141647504 EU)
(Figure 51/2) of the E-Box (Figure 51/1) to the mains
supply.
Notice!
The following describes how the operator or user can put the unit back into
service following temporary shutdown (< 24 hours).
If the unit has to be put back into service after a longer shutdown period
(> 24 hours), this may only be carried out by an expert as the unit has to be
cleaned, see chapter 1.3.3, page 5.
1
2
Figure 49
1
2
Figure 50
1
2
Figure 51