5 Maintenance
Operator manual: Postmix tower
Ribbon
49
Cornelius Deutschland GmbH
Document no. TD0000000
Version: 19/10/2017, Index 3
5.3 Visually inspecting the unit
1. Inspect the unit for damage.
Always replace any damaged components and parts.
Please contact your service partner.
2. Check that the dispensing nozzle is properly attached
(Figure 83/1).
If necessary, attach it properly to the unit.
3. Check that the drip tray is properly attached (Figure 83/
2).
If necessary, attach it properly to the unit.
4. Check the unit and the tube connections to the python
for leaks.
If there are any leaks, please inform your service partner.
5. Check the legibility of the warning signs.
Always replace any illegible warning signs. Please contact your service partner.