82
3. PV Input Mode. This allows the user to read the inverter working
mode as “Independent" or "Parallel" mode. The inverter is factory
set in Independent mode. If this needs to be set to Parallel contact
CPS to have this setting changed.
4. Neutral Line Setting. This option allows the user to select “Yes/No”
if a neutral conductor has been connected to the inverter. This
setting does not affect the operation of the inverter. When a neutral
is installed and “Yes” is selected, the inverter will display L-N
measurements.
5. Communication Setting. This interface is used to set the Modbus
ID and Baud rate for communication. More information on this is
found in the “Commissioning” section.
6. Time. Press or to select the numerical value, then press
ENT to go to next option. e.g.: Year to Month, press ESC to go to
last option. e.g.: Month to Year. Finally Press the ENT key to
confirm the setting. Press more than 1 second to go to last
position of the number when setting the parameters. e.g: 2008 to
2008. Press more than 1 second to go to the next position of
the number when setting the parameters. e.g: 2008 to 2008.
INSTRUCTION:
Please check with your local electric utility supply company before
selecting a grid standard. If the inverter is operated with an incorrect
grid standard, the electric utility supply company may cancel the
interconnection agreement.
Placing the inverter into operation before the overall system
complies with the national codes, rules and safety regulations of the
application is also not permitted.