7-1
7. ENGINE REMOVAL/INSTALLATION
SERVICE INFORMATION
GENERAL SAFETY
•Use a jack to remove or install the engine. Support the motorcycle with a jack firmly, taking precautions not to
damage the frame, engine, cable or harness.
•Attach tape to the frame to protect it during the engine removal or installation.
• The following works require engine removal for service.
- Cylinder head/valve
- Cylinder/piston
- Transmission
- Crank shaft
SPECIFICATION
TORQUE VALUES :
ENGINE HANGER BOLT (FRONT ) : 4.9㎏f·m
(REAR ) : 4.9㎏f·m
GEAR CHANGE ARM BOLT : 1.2㎏f·m
DRIVE SPROCKET BOLT : 1.2㎏f·m
LH. DOWNTUBE MOUNTING BOLT (SPECIAL BOLT) : 4.2㎏f·m
7
SERVICE INFORMATION
············
7-1
ENGINE REMOVAL
····················
7-2
ENGINE INSTALLATION
············
7-3
ITEM SPECIFICATIONS
ENGINE OIL CAPACITY(AT DISASSEMBLY) 1.5ℓ