EasyManuals Logo

DAF CF75 Series Service Manual

DAF CF75 Series
352 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #134 background imageLoading...
Page #134 background image
CE ENGINE INLET/EXHAUST SYSTEM
3-2
©
200416
Inspection and adjustment
3
ΧΦ65/75/85 series
4
3.2 INSPECTING TURBOCHARGER AXIAL BEARING PLAY
Note:
The turbocharger axial bearing play should only
be checked when the engine is cold.
1. Remove the exhaust pipe from the
turbocharger.
2. Remove the charge pipes from the
turbocharger.
3. Fit a dial gauge (1) to the charge supply
flange of the turbocharger.
4. Push the compressor shaft away from the
dial gauge and set the gauge to zero.
5. Push the compressor shaft to the dial gauge
and read off the axial play. Compare the
reading with the specified value; see
"Technical data". Replace the turbocharger if
necessary.
6. Fit the charge pipes to the turbocharger.
7. Fit the exhaust pipe to the turbocharger.
i400821
1
https://www.truck-manuals.net/

Table of Contents

Other manuals for DAF CF75 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DAF CF75 Series and is the answer not in the manual?

DAF CF75 Series Specifications

General IconGeneral
BrandDAF
ModelCF75 Series
CategoryTrucks
LanguageEnglish

Related product manuals