11 | Commissioning
Installer reference guide
209
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
1 Set the user permission level to Installer. See "To change the
user permission level"[4128].
2 Go to [A.6]: Commissioning > 10 day brine pump
operation.
3 Select On to start the 10 day brine pump operation.
Result: The 10 day brine pump operation starts.
During the 10 day brine pump operation, the setting will be displayed as
ON in the menu. Once the procedure has been completed, it will change to OFF
automatically.
NOTICE
The 10-day brine pump operation will only start if there are no errors present on the
main menu screen and the timer will only count down if either an underfloor heating
screed dryout is started, or if Space heating/cooling or Tank operation is enabled.