EasyManua.ls Logo

Daikin Altherma 3 GEO Series - Precautions When Mounting the Indoor Unit; To Install the Indoor Unit

Daikin Altherma 3 GEO Series
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 | Unit installation
Installer reference guide
61
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
6.3.2 Precautions when mounting the indoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
"1General safety precautions"[46]
"6.1Preparing the installation site"[453]
6.3.3 To install the indoor unit
1 Lift the indoor unit from the pallet and place it on the floor. See "3.2.3 To
handle the indoor unit"[417].
2 Connect the drain hose to the drain. See "6.3.4To connect the drain hose to
the drain"[462].
3 Slide the unit into position.
4 Adjust the height of the 4 levelling feet of the outer frame to compensate for
floor irregularities. The maximum allowed deviation is 1°.
≤1°
NOTICE
Do NOT tilt the unit forwards:
NOTICE
To avoid structural damage on unit, ONLY move the unit when levelling feet are at
their lowest position.
NOTICE
For optimum sound reduction, carefully check if there is no gap between the bottom
frame and the floor.

Table of Contents

Other manuals for Daikin Altherma 3 GEO Series

Related product manuals