EasyManua.ls Logo

Dell EMC PowerSwitch S4100-ON Series - Two-Post Flush-Mount Installation

Dell EMC PowerSwitch S4100-ON Series
205 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Align and seat the front ange pegs in the holes on the front side of the vertical post.
NOTE: Be sure that the rails click into place and are secure.
3 Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each ange ear and unseat each rail.
Two-post ush-mount installation
NOTE
: For more installation instructions, see the installation labels attached to the rail assembly.
1 Remove the latch castings from the front side of each ReadyRails assembly, item 1.
To remove the two screws from each front ange ear on the switch side of the rail and remove each latch casting, use a Torx
screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back ange castings.
S5200F-ON Series switch installation
37

Table of Contents

Related product manuals