2 For each rail, attach the front and back anges to the post anges with two user-supplied screws at each end.
Switch installation
For the 1U two-post congurations for the S5224F-ON, S5248F-ON, and S5232F-ON switches, slide the switch into the rails in the same
manner as the four-post congurations.
For the S5212F-ON switch installation, see One-half U front-rack installation. For the S5296F-ON switch installation, see Two U four-post
rack assembly.
1U front-rack installation
Congure the rails that are attached to the switch.
NOTE
: For more instructions, see the installation instruction labels on the rail.
1 Attach the inner switch rails to the S5200F-ON Series switch.
Line up the rail with the mounting heads and attach the rail to the switch.
Slide the rail back until it locks into place. The following shows the detail of the front stando with the locking tab:
40
S5200F-ON Series switch installation