EasyManua.ls Logo

Dell EMC PowerSwitch S4100-ON Series - Rack Mount Safety Considerations; One-Half U Front-Rack Installation

Dell EMC PowerSwitch S4100-ON Series
205 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WARNING: This document is a condensed reference. Read the safety instructions in your
Safety, Environmental, and Regulatory
information booklet before you begin.
NOTE: The illustrations in this document are not intended to represent a specic switch.
NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace.
Rack mount safety considerations
Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing
personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the rack,
then work to the top. Do not exceed your rack’s load rating.
Power considerations—Connect only to the power source specied on the unit. When you install multiple electrical components in a
rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension
cords present re and shock hazards.
Elevated ambient temperature—If installed in a closed rack assembly, the operating temperature of the rack environment may be
greater than the room ambient temperature. Use care not to exceed the 45°C (113°F) maximum ambient temperature of the switch.
Reduced air ow—Install the equipment in the rack so that the amount of airow required for safe operation of the equipment is not
compromised.
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than
the direct connections to the branch circuit, for example, use of power strips.
Do not mount the equipment with the back panel facing downward.
One-half U front-rack installation
Install the S5212F-ON switch using the following installation instructions.
NOTE
: To install the S5232F-ON, S5248F-ON, and S5224F-ON switches, see One U ReadyRails installation. To install the
S5296F-ON switch, see Two U four-post rack assembly.
The dual-tray mounting rails ship with the dual tray, not with the switch. You must supply eight rackmount screws for this installation.
To install the one-half U switch:
Attach the rails to the dual tray.
Install the dual tray in the four-post rack.
(Recommended) Attach the ground cable to the switch.
Install the switch in the dual tray.
NOTE
: Do not install the dual tray in a two-post rack.
1 Remove the dual tray and the rails from the shipping packaging and place them on a clean antistatic surface.
2 Line up the three holes on the inner switch rail with the dual-tray mounting heads.
3 Attach the rail to the dual tray. Slide the rail back until it locks into place.
32
S5200F-ON Series switch installation

Table of Contents

Related product manuals