EasyManua.ls Logo

Dell EMC PowerSwitch S4100-ON Series - One-Half U Switch Installation; One-Half U Switch Removal

Dell EMC PowerSwitch S4100-ON Series
205 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
One-half U switch installation
Install one or two half-U switches in the four-post rack-mounted dual tray.
1 Install one switch into either dual-tray slot from the front.
2 Insert the second switch in the open dual-tray slot if you are installing two switches.
The switch is fully inserted when it presses the stop features on the dual tray. The front switch latch snaps the switch into place.
Close-up view of the stop at the back of the switch.
One-half U switch removal
Remove the S5212F-ON switch using the following instructions:
NOTE
: To remove the S5232F-ON, S5248F-ON, S5296F-ON, or S5224F-ON switch, see One U ReadyRails installation. To
remove the S5296F-ON switch, see Two U four-post rack assembly.
Push in the front switch latches according to the latch arrows and pull out the switch.
34
S5200F-ON Series switch installation

Table of Contents

Related product manuals