Installing a 1U Front-Rack
To install the switch in a 1U front-rack configuration, configure the rails that are attached to the system.
1 Attach the switch rails (inner chassis members) to the switch. Item 3 in the following illustration shows the detail for the
front standoff with the locking tab.
Figure 29. Attaching the Switch Rails
2
After you have installed both switch rails, line them up on the previously mounted ReadyRails and slide the switch in until it
is flush with front of rack. About three inches before you fully insert your switch, the rail locking feature engages to keep
the switch from inadvertently sliding out of the rack and falling.
Install a S3100 Series System 39