EasyManua.ls Logo

Dell POWERCONNECT 5524P - Booting the Switch

Dell POWERCONNECT 5524P
728 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Dell PowerConnect 55xx Systems User Guide 57
Booting the Switch
After the local terminal is connected, turn on power. The switch then goes
through power-on self-test (POST). POST runs every time the switch is
started and checks hardware components, to determine if the switch is
operational before completely booting. If the system detects a critical
problem, the boot process stops. If POST passes successfully, a valid
executable image is loaded into RAM. POST messages are displayed on the
terminal and indicate test success or failure.
The boot process runs for approximately 40-45seconds.
When the boot process completes, the following LEDs are lit, as shown in
Figure 7-2:
•Power
Status
Fan (should be green)
RPS (if it is being used)
Figure 5-2. Initial LEDs
Power Status
Fan
RPS

Table of Contents

Related product manuals