E-1
English
Table of contents
Table of contents
1 Important Information.....................................................................................................................................E-4
2 Heat Pump Manager: Scope of Supply .........................................................................................................E-4
3 Installation .......................................................................................................................................................E-4
3.1 Attaching the Wall-mounted Heat Pump Manager (Heating)........................................................................................................ E-4
3.2 Temperature Sensor (Heating Controller N1) ............................................................................................................................... E-5
3.2.1 Heating Controller with Integrated Display (WPM 2006) ...................................................................................................... E-5
3.2.2 Heating controller with removable operating element (WPM 2007) ..................................................................................... E-5
3.2.3 Mounting the External Temperature Sensor......................................................................................................................... E-6
3.2.4 Mounting the Return Flow Temperature Sensor................................................................................................................... E-6
4 Electrical Installations for the Heat Pump .................................................................................................... E-7
5 Preconfiguring the Heat Pump Heating System ..........................................................................................E-9
5.1 Menu ............................................................................................................................................................................................. E-9
6 Configuring the Heat Pump Heating System .............................................................................................E-11
6.1 Settings ....................................................................................................................................................................................... E-11
6.5 Modem / PC Link......................................................................................................................................................................... E-22
7.1 Setting a Heating Curve on the Basis of the Outside Temperature ............................................................................................ E-23
7.1.1 Examples of Settings.......................................................................................................................................................... E-24
7.2 Regulation via Room Temperature ............................................................................................................................................. E-25
7.3 Fixed-setpoint Regulation / Setting a Horizontal Heating Characteristic Curve .......................................................................... E-25
8 DHW Preparation ..........................................................................................................................................E-26
8.1 Basic Heating Using the Heat Pump........................................................................................................................................... E-26
8.1.1 Attainable Hot Water Temperatures ................................................................................................................................... E-26
8.1.2 Hot Water Temperatures Dependent on the Heat Source.................................................................................................. E-26
8.2 Reheating with Flange Heater/2nd Heat Generator.................................................................................................................... E-26
8.3 Thermal Disinfection ................................................................................................................................................................... E-27
9 Program Description ....................................................................................................................................E-27
9.1 Faults .......................................................................................................................................................................................... E-27
9.2 Limit Temperature (Bivalence Point)........................................................................................................................................... E-27
9.3 Utility Block / Heat Pump Operation Block.................................................................................................................................. E-27
9.4 Control of the 2nd Heat Generator.............................................................................................................................................. E-28
9.4.1 Control of Immersion Heaters............................................................................................................................................. E-28
9.4.2 Constantly Regulated Boiler (Mixer Regulation)................................................................................................................. E-28
9.4.3 Variably-Regulated (Gliding) Boiler (Burner Regulation).................................................................................................... E-28
9.4.4 Special Program for Older Boilers and Main Cylinder Systems ......................................................................................... E-28
9.4.5 Bivalent-regenerative.......................................................................................................................................................... E-28
9.5 Power Regulation........................................................................................................................................................................ E-29
9.5.1 Heat Pumps with one Compressor..................................................................................................................................... E-29
9.5.2 Heat Pumps with Two Compressors .................................................................................................................................. E-29
9.5.3 High-temperature Air-to-Water Heat Pumps....................................................................................................................... E-30
9.6 Hysteresis ................................................................................................................................................................................... E-30
9.7 Control of Circulating Pumps ...................................................................................................................................................... E-30
9.7.1 Heat Circulating Pump/Antifreeze (Frost Protection).......................................................................................................... E-30
9.7.2 Hot Water Circulating Pump ............................................................................................................................................... E-30
9.7.3 Swimming Pool Water Circulating Pump............................................................................................................................ E-31
9.7.4 Auxiliary Circulating Pump.................................................................................................................................................. E-31
9.7.5 Primary Pump for Heat Source........................................................................................................................................... E-31
10 Start-Up: Air-to-Water Heat Pumps .............................................................................................................E-31
11 Initial Heating Program (Drying of Screed Flooring) .................................................................................E-32
11.1 Implementing the Heat Pump Heating System Directive ............................................................................................................ E-32
11.2 Initial Heating According to DIN EN 1264-4................................................................................................................................ E-32