Do you have a question about the Dionex ICS-1000 and is the answer not in the manual?
Brand | Dionex |
---|---|
Model | ICS-1000 |
Category | Laboratory Equipment |
Language | English |
Introduces ion analysis and the ICS-1000 system, explaining the process.
Describes the ICS-1000 system components and its optional configuration, including software.
Explains the structure and content of the manual, detailing each chapter and appendix.
Details the operational aspects of the ICS-1000, including panel descriptions.
Illustrates the liquid flow path through the ICS-1000 system.
Provides an overview of the Chromeleon software interface for ICS-1000 control.
Provides detailed descriptions of individual ICS-1000 system components.
Outlines the basic steps for routine operation of the ICS-1000.
Provides instructions for powering on the ICS-1000 system.
Guides on how to start the Chromeleon software for system control.
Details the steps for preparing and setting up the eluent reservoir.
Lists essential checks for ensuring proper system connections.
Provides step-by-step instructions for priming the ICS-1000 pump.
Explains how to set and verify system operating parameters.
Guides on system equilibration and verifying operational readiness.
Outlines procedures for collecting, storing, pretreating, and diluting samples.
Describes how to load and inject samples using syringes or autosamplers.
Covers manual and automatic sample processing procedures.
Outlines routine maintenance procedures for the ICS-1000.
Lists and describes common alarms and error messages.
Discusses troubleshooting steps for liquid leaks in the system.
Provides solutions for issues related to pump priming.
Offers steps to troubleshoot when the pump fails to start.
Covers troubleshooting steps for situations with no eluent flow.
Addresses issues causing erratic flow or pressure readings.
Provides solutions for excessive backpressure in the system.
Explains the phenomenon of peak ghosting and its potential causes.
Offers solutions for inconsistent peak height or retention times.
Addresses issues causing abnormal retention time or selectivity.
Provides troubleshooting steps for no response from the conductivity cell.
Discusses potential causes and solutions for high cell output.
Offers troubleshooting steps for baseline noise or drift.
Provides solutions for when the vacuum degas assembly does not operate.
Outlines procedures for system diagnostics and calibration.
Describes methods for identifying restrictions in liquid lines.
Provides instructions for replacing tubing and fittings.
Details the process for rebuilding the injection valve.
Explains how to clean and replace pump check valves.
Guides on replacing pump piston seals and rinse seals.
Provides instructions for replacing the pump piston.
Details the procedure for replacing O-rings in waste or priming valves.
Guides on how to replace the conductivity cell.
Provides instructions for replacing the suppressor.
Details the process for replacing the column heater.
Guides on replacing the column heater heat exchanger.
Provides instructions for replacing the eluent valve.
Details the process for replacing the leak sensor.
Explains priming the pump with isopropyl alcohol when standard methods fail.
Guides on how to change the main power fuses.
Details the main power supply voltage/frequency range and fuse requirements.
Lists the physical dimensions, weight, and decibel level.
Covers operating temperature, humidity, and pressure specifications.
Specifies the functions of the front panel LEDs.
Details pump type, flow rate, accuracy, pressure, and ripple.
Lists detector range, temperature compensation, cell drive, and linearity.
Provides specifications for the conductivity cell and heat exchanger.
Details the injection valve type and its components.
Lists specifications for the optional vacuum degas assembly.
Provides specifications for the optional column heater.
Outlines the necessary facility requirements for ICS-1000 installation.
Guides on safely unpacking the ICS-1000 system.
Provides steps for installing the Chromeleon software.
Guides on installing the necessary software license for Chromeleon.
Details how to connect the ICS-1000 to the computer via USB.
Guides on connecting the power cord.
Provides instructions for turning on the ICS-1000 system power.
Outlines the steps for setting up Chromeleon.
Details the installation and plumbing of columns and suppressor.
Guides on connecting the waste lines.
Details the steps for setting up the eluent reservoir.
Guides on creating and setting up a Chromeleon application.
Guides on setting the eluent level in the reservoir.
Provides comprehensive instructions for priming the pump.
Guides on equilibrating the system after priming.
Describes how to verify the system's operational status.
Guides on connecting the optional AS50 autosampler.
Guides on connecting the optional AS40 automated sampler.
Details the optional analog output connection.
Guides on pressurizing the eluent reservoir.
Guides on setting up the pump continuous seal wash.
Explains manual connection to a control panel.
Addresses common problems encountered during installation.
Describes the TTL and relay connector and its pin functions.
Explains how to control TTL and relay outputs for external devices.
Provides an example setup for stand-alone operation.
Provides instructions for connecting AS50 and AS40 autosamplers.
Explains how to print from Chromeleon.
Discusses reasons for shifting retention times and troubleshooting.
Explains how retention times are calculated and adjusted.
Advises on the frequency of remaking calibration standards.
Provides guidance on when to remake eluents.
Instructs on how to launch the Chromeleon software.
Explains the procedure for deleting data in Chromeleon.
Guides on backing up data from Chromeleon.
Details the procedure for shutting down the ICS-1000 system.
Provides instructions on proper column storage.
Advises on identifying a dirty chromatography column.
Provides guidance on cleaning chromatography columns.
Discusses common reasons for high conductivity.