EasyManua.ls Logo

Ditch Witch JT40 - Unload Unit from Trailer; Retrieval of Disabled Unit

Ditch Witch JT40
253 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT40/JT40 All Terrain Operators Manual Transport - 115
Load
Tie Down
Points
Tiedown points are identified by tiedown decals. Securing to trailer at other
points can damage machinery.
Procedure
Loop a transport chain around each tie down point. See chart below for correct distances between tiedown
ends. Make sure tiedowns are tight before transporting.
NOTICE:
Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in wrenches is
attached to spindle or removed before transport.
Use Grade 7-3/8” (18.7 cm) transport chain to secure drilling unit.
IMPORTANT: If hauling unit without pipe box, remove remaining pipe in drill frame chute.
Distance U.S. Metric
A greater than 18” greater than 45.72 cm
B less than 50” less than 127 cm
C greater than 10” greater than 25.4 cm

Table of Contents

Related product manuals