JT40/JT40 All Terrain Operator’s Manual Systems and Equipment - 153
Electric Strike System
Assemble Voltage Detector
1. Drive voltage stake into ground at least 6’ (2 m)
away from any part of system.
2. Clip voltage limiter to voltage stake.
Test Strike System
If system fails any part of this test, see “Troubleshoot Strike System” on the following page. Do not drill until
test is completed successfully.
1. Turn on drilling unit.
2. To test alarms and strobe, press the test button on the left console. See “ESID alarm interrupt/self-test
switch” on page 42.
3. Press the ESID soft key to view test results and historical data stored in the upper display. This data
includes:
• ESID bar graph
• alphanumeric readout showing volts and amps
• current diagnostic codes, or diagnostic codes detected during previous tests
4. Use Electric Strike Simulator to test voltage and current sensors. See page 156.