EasyManua.ls Logo

Ditch Witch JT40 - Electric Strike System Setup and Testing

Ditch Witch JT40
253 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT40/JT40 All Terrain Operators Manual Systems and Equipment - 151
Anchor System
Alternate Anchors
Use tie-off points on machine in situations where anchors cannot be used or in combination with the
anchors in situations where additional anchoring is needed. Contact a rigging specialist for assistance with
this process to ensure the rigging can withstand potential forces.
1. Use alternate anchoring option (1) when
backreaming. Connect chain to pin and run
straight back from machine.
2. Use rings located on front of anchor frame
(2) to anchor machine when drilling out.
Connect a chain to each ear and run
straight forward from machine.
3. Connect ground rod included in grounding
kit to drill frame as shown.
NOTICE:
If using remote tie-offs instead of anchors, additional grounding of the machine will need to be done
using kit 100-794.
Avoid drill string when implementing remote tie-off option.
Rigging must be able to withstand forces of up to 40,000 lb (178 kN).
NOTICE: Ensure that pin is secure
before attaching chain to it.
NOTICE: Looping the chain through
the ears will case damage to the
frame.
1
2
j59om072w.eps
j59om121w.eps

Table of Contents

Related product manuals