EasyManua.ls Logo

Ditch Witch JT40 - Startup;10 Hour Service Intervals

Ditch Witch JT40
253 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT40/JT40 All Terrain Operators Manual Service - 207
Each Use
Each Use
Lube Rockmaster Tool
1. Remove plugs (2,4) from tool body and install
zerk (3).
2. Inject WRG into zerk. See “Recommended
Lubricants/Service Key” on page 202.
3. Continue pumping until new, clean grease
seeps into the open front port.
4. Replace plug (4).
5. Inject 1-5 pumps WRG into zerk.
6. Remove zerk and reinstall rear plug.
Location Task Notes
DOWNHOLE
TOOL
AT Rockmaster
®
tool
AT only; WRG (p/n 255-1019)
IMPORTANT: Do not use calcium-based
grease. Use only Ditch Witch
®
recommended grease or equivalent.
IMPORTANT: Discontinue lubing the Rockmaster tool when there is resistance to adding more
grease.
j59om070w.eps
1
2
3
4

Table of Contents

Related product manuals