3. Turn on the static bypass switch to connect bypass input to the UPS.
4. Turn the MBS from the bypass position to the test position.
5. Perform the UPS start-up procedure (bypass mode) in Section
7.3.2
.
6. Turn the MBS from the test position to the UPS position.
7. Perform the transfer from the bypass mode to the double conversion mode
as described in Section
7.3.4
.
The UPS is now in the double conversion mode.
Figure 48. Double conversion mode
A Static bypass input 1 Maintenance Bypass Switch (MBS)
B Rectifier input
C Out
Eaton 93PM UPS 30–200 kVA User's and installation guide
©
Eaton Corporation plc 2017. All rights reserved. Revision: 005 Document ID: P-164000249 106 (126)