EasyManua.ls Logo

Eaton 93PM - 4 UPS Installation Plan and Unpacking; Creating an Installation Plan

Eaton 93PM
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 UPS installation plan and unpacking
Use the following basic sequence of steps to install the UPS:
1. Create an installation plan for the UPS system.
2. Prepare your site for the UPS system.
3. Inspect and unpack the UPS cabinet.
4. Unload and install the UPS cabinet and wire the system.
5. Complete the installation checklist provided in Section
4.2
.
6. Have authorized service personnel perform the preliminary operational
checks and startup.
Note: Startup and operational checks must be performed by an authorized
Eaton Customer Service Engineer or by other qualified service personnel
authorized by Eaton, or the terms specified in the Warranty (see Chapter
10
)
become void. This service is offered as a part of the sales contract for the
UPS. Contact service in advance (usually a two-week notice is required) to
reserve a preferred startup date.
4.1 Creating an installation plan
Before you install the UPS system, read and understand how these instructions
apply to the system that you are going to install. Use the procedures and
illustrations in Section
4.3
and Chapter
5
to create a logical plan for installing the
system.
Eaton 93PM UPS 30–200 kVA
User's and installation guide
©
Eaton Corporation plc 2017. All rights reserved. Revision: 005 Document ID: P-164000249 35 (126)

Table of Contents

Other manuals for Eaton 93PM

Related product manuals