Installation
Eaton ePDU G3 Operation Manual P-164000277—Rev 1 www.eaton.com/ePDU 22
Installing the Horizontal Models in a Rack Cabinet
NOTE For horizontal installations in square-hole racks, a cage nut must be installed in the
selected mounting holes.
To install the ePDU models horizontally:
1. Select the desired height position to install the ePDU.
NOTE 1 The two black mounting brackets are pre-installed on unit.
NOTE 2 Make sure to select mounting holes that are parallel to each other so that the ePDU
will be level when installed.
2. F
or square-hole racks. Install cage nuts in the appropriate mounting holes. Insert and tighten two M6
screws through the ears on each side of the ePDU.
3. F
or all other racks. Insert and tighten two M6 screws through the ears on each side of the ePDU (see
Figure 20).
Figure 20. Installing Horizontal Models
4. Continue to “Grounding the ePDU” if you are installing a ground screw and grounding cable. Otherwise,
go to “Network and Environmental Ports” on page 24.