Loading...
Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P-164001108—Rev 01 9
CChhaapptteerr 33 IInnssttaallllaattiioonn
This product must be installed and inspected by licensed electricians or by Eaton-authorized technicians. This
document should not be viewed as sufficient by otherwise non-qualified personnel to operate, service, or
maintain this equipment.
Severe or fatal injury can result from electrical shock during contact with high voltage conductors, monitoring
PCBs, or similar equipment!
Disconnect power before drilling holes, making cutouts, attaching conduit, or connecting to PDUs, RPPs,
or other power distribution equipment.
Use Lock Out/Tag Out procedures.
Wear suitable personal protective clothing and use protective equipment for performing mechanical and
electrical installations.
Leave ample space for attaching and routing wires.
33..11 MMoouunnttiinngg aanndd CCoonndduuiitt
The enclosure for both the BCMS Hub and the BCMS Dual Hub is 24"W x 24"H x 5"D. The BCMS Hub or BCMS
Dual Hub must be securely mounted on a wall or mounted on a frame attached to poles or another solid
surface. Customers must make their own conduit cutouts on the enclosure.
Figure 4. BCMS Hub and BCMS Dual Hub Enclosures
33..22 CCuussttoommeerr CCoonnnneeccttiioonnss BBCCMMSS HHuubb
Customer connections are mostly made to the left inside panel. Figure 5 shows inside panels as manufactured.
Figure 6 and Figure 7 show the BCMS Hub wired for a TCP/IP upstream link to a BMS or DCIM system using
the optional Ethernet connection while the upstream Modbus RTU link is not used.