EasyManua.ls Logo

Eaton Pow-R-Line SPX0370245 - ANSI Installation Steps; ANSI Mounting Procedure

Eaton Pow-R-Line SPX0370245
584 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.eaton.com IM02601001E 3-3
Mechanical Installation

1. Insert 4 threaded rods by hand into the back of meter. Twist until secure.
2. Slide NEMA 12 Mounting Gasket onto back of meter with rods in place.
3. Slide meter with Mounting Gasket into panel.
4. Secure from back of panel with lock washer and nut on each threaded rod.
Use a small wrench to tighten. Do not overtighten. The maximum installation torque
is 0.4 Newton-Meter.
NEMA 12 Mounting Gasket
Threaded Rods
Lock Washer
and Nut
Figure 3.7: ANSI Mounting Procedure

Table of Contents

Related product manuals