EasyManua.ls Logo

Ecotechnics ECK FLAG - VACUUM PROCEDURE

Default Icon
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTRUCTIONS MANUAL
-43-
Press to continue, or press to go back.
Connect and open the coupling connected to the A/C system, then press to start the
vacuum phase
When time of check is reached, the machine will test for leaks in the A/C system:
(WARNING! If vacuum time is lower than 15 minutes this test is not reliable). If leaks are
found, the machine will stop automatically and display the A/C SYSTEM LEAKS alarm.
Detection of micro-leaks is not guaranteed.
At the end of the preset vacuum time, the machine will sound and alarm and the following
screen will be displayed:
Close and disconnect HP and LP coupling from A/C system, then press to return to the
MAIN MENU; VACUUM PROCEDURE is now successfully completed.
Connect and open HP and LP couplings
To A/C system and press to continue
DD/MM/YY XX:XX PM
MANUAL / VACUUM
Vacuum
DD/MM/YY XX:XX PM
MANUAL / VACUUM
A/C pressure
0 bar
01:57
Close and disconnect HP and LP couplings
from A/C system
DD/MM/YY XX:XX PM
MANUAL / VACUUM
Vacuum time
15 min
Time of check
10 min
Leak test
DD/MM/YY XX:XX PM
MANUAL / VACUUM
A/C pressure
-0.99 bar
00:51

Table of Contents

Related product manuals