EasyManua.ls Logo

ELTRA ELEMENTRAC CS-i - Page 46

ELTRA ELEMENTRAC CS-i
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
46
20. Carefully slide the hose (1) onto the reagent tube (5).
The hose must be pushed at least 5 mm over the
reagent tube connector.
21. Secure the hose (1) using the clamp (2).
The reagent tube on the catalyst furnace has been filled.

Table of Contents

Related product manuals