AIRPLANE
FLIGHT
SUPPLEMENT 4
PRIMUS EPIC - FLIGHT
MANAGEMENT SYSTEM
ANAC APPROVED S4-05
REVISION 15 code 01 Page 5
Copyright © by Embraer. Refer to cover page for details.
- Use of VNAV guidance below the published approach minimums is
prohibited.
- VNAV path guidance is supplementary guidance information. The
flight crew must rely on the altimeter as the primary altitude
reference during the final approach segment, including step down
fixes.
- For airplanes Pre-Mod. SB 170-31-0034 (LOAD 21.4), when using
VGP, use of Temperature Compensation is prohibited.
- For airplanes Post-Mod. SB 170-31-0028 (LOAD 21.2) or with an
equivalent modification factory incorporated, and Pre-Mod.
SB 170-31-0034 (LOAD 21.4), VGP approaches are prohibited.