4. Cable your system as described in Cable your system on page 39.
5. Power up your system by connecting power cables, and then verify that the system
components powered up correctly by checking the LEDs of the system as described in
Power up on page 47.
6. Install and power up all additional disk-array enclosures (DAE) into your cabinet as
described in Add additional storage on page 55.
7. Complete the tasks listed in Setup on page 67.
Introduction
Overview of installing in a customer cabinet 7