EasyManua.ls Logo

Endress+Hauser Proline Prosonic Flow 91 - Installation Procedures; Incoming Acceptance, Transport, and Storage

Endress+Hauser Proline Prosonic Flow 91
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Proline Prosonic Flow 91
10 Endress+Hauser
3 Installation
3.1 Incoming acceptance, transport and storage
3.1.1 Incoming acceptance
On receipt of the goods, check the following points:
Check the packaging and the contents for damage.
Check the shipment, make sure nothing is missing and that the scope of supply matches your
order.
3.1.2 Transport
The devices must be transported in the container supplied when transporting them to the measuring
point.
3.1.3 Storage
Note the following points:
Pack the measuring device in such a way as to protect it reliably against impact for storage
(and transportation).
The original packaging provides optimum protection.
The storage temperature corresponds to the ambient temperature range of the transmitter, the
measuring sensors and the corresponding sensor cables ä 64.
The measuring device must be protected against direct sunlight during storage in order to avoid
unacceptably high surface temperatures.

Table of Contents

Related product manuals